In a feat of engineering, Broad Group, a Chinese building company, constructed a 30-story hotel in just 360 hours using prefabricated materials. Judging from the timelapse video above, the entire thing went up like it was made of LEGOs.
From the article in the Los Angeles Times:
Raising a 30-story tower in two weeks is possible because most of the work is done in a factory and the foundation has been laid ahead of time.China's abundance of workers also helps.But a job done quickly is not always a job done well. [Zhang Li, a Beijing architect] said that in their race to the finish line, many Chinese construction companies skimp on the meticulous reviews and inspections that make projects in the West drag on for years.
"Incredible speed also means incredible risk," he said. "But only time will tell how serious the risk is."
Please enter your comment below. Hit Return twice (leaving a completely blank line) between paragraphs.
Use [b] for bold [/b] and [i] for italic [/i]. All other HTML commands will be stripped.
Your comment is (almost) immediately placed online as soon as you hit 'Post'.
Specifying an email address is optional. In the interests of your own privacy, CoN discourages you from doing so. Further, think twice about revealing any other personal information including telephone number, real name, exact address or blood type.
* A red asterisk denotes a required field.